Sidewalk, Curb and Drive Approach Repair – 2024 Project

 

Project Description

This project includes concrete repair of deteriorated curbs, sidewalks and drive approaches. Property owners will be responsible for the necessary repairs to the curbs, sidewalks, and drive approaches and will be assessed the cost for the repairs. The roads will be resurfaced after concrete repairs are complete, except for random locations.

Streets Included

North, South and East Aragon, Barryknoll, Bellfield, Carlyle, Dell Ridge, Edenhill, Fawnwood, Fulton, Galewood, Meadowcroft, Mendota, Midvale, Schrubb, Selby, Silverwood, Stanton Hall, Tabor, Woodman,  and random locations.

Project Update

Paving is complete and the project is substantially complete. Crews will be adjusting manhole covers and water valves to grade in the coming weeks. Also, additional topsoil and seeding is scheduled in Newcom Knolls and some miscellaneous areas.

Bid Date:  February 8, 2024
Bid Results                                Bid Tab

 

Contractor:

RA Miller

Project Engineer:  Mike Zink, P.E.
Email:  Mike.zink@ketteringoh.org

 

Close window