Asphalt Overlay 2024
Project Description
Each year the City of Kettering evaluates the conditions of all the city streets to create the annual street maintenance program. After the streets are evaluated, they are then ranked according to the pavement condition and a list is created for the streets that may be paved this year.
Project Update
Barrett Paving Contractors, in collaboration with the City of Kettering, is set to start pavement resurfacing on Woodman Drive, stretching from East Dorothy Lane up to Danube Court starting on Monday, June 17th. Throughout the project, Woodman Drive will remain open to vehicles; however, traffic flow will be condensed to a single lane each way. The duration of the construction is anticipated to span several weeks in different phases, weather permitting.
![Woodman Drive - Dorothy to Danube](https://storage.googleapis.com/proudcity/ketteringoh/2024/06/Woodman-Drive-Dorothy-to-Danube-Paving-6-12-24-1024x784.png)
Project Location
This year’s Asphalt Overlay Program includes milling the existing asphalt and paving a new asphalt on Several residential streets. Streets to be resurfaced: Ridgeview (Southdale to Wrenford). Beaumonde, South Dixie (Hoyle to W Stroop), Avon Way, Canterbury, Lenox, Winding Way (Lenox to Far Hills), N and S Claridge, Pelham N andS, Wyngate, Tamarac Trail, Foxridge, Twilight Hills, Old Church, Woodman Dr (Stocker to E Dorothy), Peach Orchard (Madix to West), Lincoln Park (Ackerman to Waltham).
Bid Date: February 1, 2024
Contractor
Barrett Paving
Project Engineer: Chad Ingle, P.E., P.S.
Email: chad.ingle@ketteringoh.org