Search Results for

Asphalt Overlay 2024

Project Description Each year the City of Kettering evaluates the conditions of all the city streets to create the annual street maintenance program.  After the streets are evaluated, they are then ranked according to the pavement condition and a list is created for the streets that may be paved this year. Project Location This year’s … Continued

4C for Children Childcare Resources

The City of Kettering is participating in a pilot program aimed at creating more in-home child care options. A study by 4C For Children found that there are only a few state-licensed residential child care sites in the city. An in-home care site is required to have an Ohio license to house more than six … Continued

West Avenue Pedestrian Bridge

Project Description Construction of a prefabricated pedestrian bridge and relevant concrete sidewalk. Project Location West Avenue between Peach Orchard Road and Eureka Drive (northwest of intersection of Dorothy Lane and Wilmington Pike). Bid Date: February 29, 2024 Bid Results                             Bid Tab Contractor … Continued

Research Boulevard and Far Hills Avenue Resurfacing

Project Description Resurfacing of the asphalt roadway pavement. Project Locations Research Boulevard (State Route 835) from Woodman Drive to County Line Road. Far Hills Avenue (State Route 48) from David Road to Enid Avenue Bid Date: The Ohio Department of Transportation will open bids in Fall 2024 Contractor TBD Project Sponsor Ohio Department of Transportation … Continued

Wilmington Pike Drainage Improvements

Project Description This project involves a 24″ storm sewer replacement on Wilmington Pike between Imperial Blvd and Eureka Drive. Additional work shall include the removal and replacement of asphalt pavement. Project Update: 4/11/2024  This project will begin April 22, 2024 with an estimated completion date of October 19, 2024. Project Location Southbound Wilmington Pike between … Continued

Close window