Wilmington Pike Resurfacing

 

Bid Date: February 9, 2023

Project Description

Replacement of deteriorated curbs, sidewalks and drive approaches, then roadway resurfacing.

Project Limits

Wilmington Pike from Beaverton Drive to Stroop Road

Bid Results

Bid Tab

Contractor

Barrett Paving

Project Engineer

Chad Ingle, PE, PS
Email:  Chad.ingle@ketteringoh.org

Close window