Smithville Road Resurfacing

 

Status Update: A pre-construction meeting was held Friday April 29, 2022. Concrete work will begin in June.  Work is expected to be completed by the September.

Bid Date: February 17, 2022

Project Description: Replacement of deteriorated curbs, sidewalks and drive approaches, then roadway resurfacing.
Project Limits: Smithville Road, from Wilmington Pike to the north corporation line.

Bid Results

Bid Tab

Contractor: Barrett Paving
Project Engineer: Diane Wuensch, P.E.