Forrer Boulevard Improvements

Status Update: June 22, 2022 For the length of the project, concrete curb, median, drive approach, sidewalk, and curb ramps are being replaced where needed. On the east end of Forrer, the contractor is in the weeks long process of full-depth removal of the pavement on the westbound lanes. On the west end of Forrer, the contractor is in the weeks long process of full-depth removal of the pavement on the curb lanes. When these sections are completed to the intermediate course of pavement, the contractor will switch traffic to complete the middle lane (west side of Forrer) and the eastbound lanes (east side of Forrer).
Two-way traffic and entry to post office will continued to be maintained at all times, but delays should be anticipated, especially during peak hours.
Bid Date:   March 10, 2022
Project Description: This project includes repair of deteriorated curbs, sidewalks and drive approaches, full-depth pavement replacement in sections, plus resurfacing of the asphalt pavement.
Project Location: Forrer Blvd., from Woodman Drive to Smithville Road
Traffic Impact: Two-way traffic will be maintained, but delays should be anticipated, especially during peak hours.

Bid Results

Bid Tab

Contractor: Barrett Paving
Project Coordination: John Sliemers,  P.E.